Painting & Detailing |
|
Spray Rails
You will need
one piece of 1/8" x 1/8" x 24" basswood from Bag Number Two (#2)
to complete this section.
Cut two spray
rails from the basswood strip to the lengths shown on the plan.
The front end of each rail is to be cut at a 45" angle, as
shown.
After painting
the spray rails, glue them to the hull with Slow CA, parallel to
the waterline and flush with the transom, as shown here and on
the plan.
|
Dashboard Molding
Cut the dashboard molding from one
piece of 24" mahogany to fit across the rear edge of the
dashboard, as shown. Apply Slow CA to this piece and curve it
into position against the rear edge of the dashboard.
Chafing Gear
Use the remaining piece of mahogany
from the dashboard and the scraps from the other moldings to cut
the chafing gear to the lengths shown on the plan. Glue these
pieces to the right side of the hull with Slow CA, as shown on
the Side View of the plan.
|